Building and Renovating

If you are Building or Renovating in the Municipality of Red Lake you may need to obtain a Building Permit.

For information on general permit pricing; see our Building Permit Bylaw. When you apply for a building permit the building inspector will produce an itemized invoice of fees to be charged.

To help you decide if you need to obtain a permit our consultants have provided a list of examples below. If your project does not appear as an example contact info@rsmbuildingconsultants.com 

The following is a list of common projects that require a building permit. If you don’t see your project here or are unsure and require more information contact our building inspection contractors via email at info@rsmbuildingconsultants.com 

1. Construct a new building

2. Construct an addition to an existing building, such as

  • second or third story additions
  • attached garages, carports
  • sunrooms
  • solariums, porches, decks

3. Make structural or material alterations, such as:

  • adding or removing walls (i.e., changing room sizes and/or uses)
  • new windows or doors where there were none before
  • enlarging or relocating existing windows or doors
  • enclosing an existing deck, porch or patio of any size

4. Construct an accessory structure larger than 10 square metres in gross area, such as:

  • Detached Garage
  • Workshop
  • Carport
  • Pool house or cabana
  • Sheds greater than 15 square meters

If you are constructing an accessory structure and it is attached to an existing building and/or has plumbing, regardless of its size, a building permit is required.

5. Finishing a basement, if the work proposed includes any of the following;

  • structural or material alterations
  • installing or modifying heating and or plumbing systems
  • excavating and/or constructing foundations
  • basement underpinning
  • constructing a basement entrance
  • adding a second suite

6. Energy and environmental building improvements, such as:

  • roof top storm water retention systems
  • green roofs
  • structures used in the support of a wind turbine generator with a rated output of more than 3kW
  • solar projects such as installation of solar collector systems and solar hot water systems

7. Construct a deck more than 60 centimetres (24 inches) above ground

8. Construct a retaining wall more than one metre (3 feet 3 inches) in height provided the retaining wall is on or adjacent to public property (including streets), building entrances, and on private property accessible to the public

9. Constructing a tent that:

  • covers more than 60 metres squared (646 square feet); and/or
  • is attached to a building; and/or
  • is within 3 metres (9 feet 10 inches) from another structure

10. Demolish or remove all, or a portion of a building,

11. Install or reconstruct a chimney or fireplace,

12. Install a wood burning stove or fireplace,

13. Install or modify heating and/or plumbing systems,

14. Install a backwater valve,

15. Install a backflow prevention device

16. Change a building’s use (i.e. from residential to office or single dwelling unit house to multi-dwelling unit house). Even if no construction is proposed, if a change of use is proposed a building permit is required.

The following are examples of work which do not require a building permit and are not subject to the provisions of the building code. However, please note that this list is not exhaustive and judgment should be used depending on the situation and circumstances associated with the project. Even if a building permit is not required, compliance with the Zoning Bylaw is required.

1. An uncovered platform (e.g. deck) provided:

  • its finished deck level is not more than 60 cm (24 inches) above the adjacent finished grade; and/or
  • it does not form part of an exit required under the building code; and
  • complies with the Zoning Bylaw.

2. Installing a skylight in an existing building provided:

  • the building is a house or small building (3 storeys or less) and
  • the installation does not require the removal of more than one rafter, joist, or other similar structural member (with the exception of a truss);

3. Re-cladding of a house or small building (3 storeys or less) with non-combustible material other than brick or stone veneer;

4. Adding or replacing insulation;

5. The replacement of windows or doors provided:

  • there is no change in the location or size of the window and/or door;
  • the structural support for the opening (i.e. lintel) is not affected; and
  • a new exit is not created;

6. Replacing a furnace or boiler in a house;

7. The installation of additional cooling systems, gas fireplaces, air cleaners, in-line humidifiers, or hot water tanks in a house;

8. Repairing and replacing plumbing fixtures;

9. Replacing existing roofing material provided no structural work is required;

10. Finishing a basement of a house, if:

  • the work does not include structural or material alterations;
  • no additional dwelling unit(s) is (are) created (i.e. a second unit); and
  • the work does not include the installation of new plumbing;

11. Undertaking waterproofing repairs to a basement;

12. Installation of cabinetry and millwork.

13. Plastic Sheet Covered Accessory Structures (i.e. snow canopies, driveway tents, automotive canopy) do not require a building permit if installed on or after October 15th and are removed on or before April 15th. Compliance with the Zoning Bylaw is required.

14. Constructing a retaining wall that is on private property, not accessible to the public and/or where the height is less than 1 metre in height at any location.

15. A building permit is not required to install a sump pump.

16. A building permit is not required to install a temporary “hoop house” which has roll up plastic tarping, open ends, the hoops are not encased in concrete piers in the ground and the tarping is removed in the winter months.   A hoop house is used for agricultural farming purposes only

Scroll to top